The plant and copper complex is for sale if interested but my JV contract to operate a developed high-grade copper/gold mine within the plant complex.
High grade resource (20kmt 5%Cu, 1.5gpt Au)
Mine plan
Haul road built
Plant on site
Ore trucks on site
Fully Permitted (explosives magazine)
Trade financing available at plant
50 TPD in 3 months
Extensive development
800m tunneling (2.5 x 2.5m scoop size)
multiple levels (natural ventilation)
partially prepared for 100 tpd
immediate development ore production